您当前的位置:
首页 >
文章列表页 >
TECHNOLOGY OF ADDITIONALLY SUPPLYING STEAM AT OVERLOAD TO ULTRA-SUPERCRITICAL STEAM TURBINE IN HUANENG YUHUAN POWER PLANT
Thermal Power Generation   Issue 4, Pages: 71-73(2007)
更新时间:2025-09-28
    • TECHNOLOGY OF ADDITIONALLY SUPPLYING STEAM AT OVERLOAD TO ULTRA-SUPERCRITICAL STEAM TURBINE IN HUANENG YUHUAN POWER PLANT

    • DOI:10.19666/j.rlfd.2007.04.019    

      CLC: TK267
    • Published:2007

    移动端阅览

  • CHEN Sheng-jun1, SHEN Song-lin2, KE Wen-shi1(1.Zhejiang Branch of Huaneng Corporation. TECHNOLOGY OF ADDITIONALLY SUPPLYING STEAM AT OVERLOAD TO ULTRA-SUPERCRITICAL STEAM TURBINE IN HUANENG YUHUAN POWER PLANT[J]. Thermal Power Generation, 2007, (4): 71-73. DOI: 10.19666/j.rlfd.2007.04.019.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

295

下载量

13

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

Vibration safety assessment for central full partition wall in a 700 MW high-efficiency ultra-supercritical CFB boiler
Thermal hydrodynamic performance of vertically-upward water wall in an ultra-supercritical double-reheat boiler with high working parameters
Water wall temperature deviation of an ultra-supercritical 1 000 MW unit boiler: analysis and countermeasures
Economy analysis for an ultra supercritical 1 000 MW unit with EC-BEST thermal dynamic system
Analysis and optimization for online operation performance indexes of the ultra supercritical 1 000 MW double-reheat unit in Laiwu Power Plant

Related Author

吕卓
鲁佳易
邓启刚
周旭
邱彬彬
董晨昊
蹇开林
程乐鸣

Related Institution

Huaneng Anyuan Power Generation Co., Ltd.
Guodian Taizhou Power Generation Co., Ltd.
Xi’an Thermal Power Research Institute Co., Ltd.
国家电投集团河南电力有限公司技术信息中心
国家电投集团河南电力有限公司平顶山发电分公司
0