您当前的位置:
首页 >
文章列表页 >
TEST OF 200 MW UNIT RB
Thermal Power Generation   Issue 5, Pages: 68-69(2007)
更新时间:2025-09-28
    • TEST OF 200 MW UNIT RB

    • DOI:10.19666/j.rlfd.2007.05.020    

      CLC: TK32
    • Published:2007

    移动端阅览

  • QIN Guang-ming(Shaoguan Power Plant. TEST OF 200 MW UNIT RB[J]. Thermal Power Generation, 2007, (5): 68-69. DOI: 10.19666/j.rlfd.2007.05.020.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

47

下载量

1

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

TEST STUDY ON INTERLOCK AND SWITCH OVER OF FUEL-OIL PUMP
IMPROVEMENT OF RB CONTROL STRATEGY FOR 300 MW THERMAL POWER UNITS AND IMPLEMENTATION THEREOF
STUDY ON AGC CONTROL FUNCTION OPTIMIZATION FOR UNITS NO.1 AND NO.2 IN HUANENG RIZHAO POWER PLANT
Experimental study on circulating water treatment in coal-fired power plants using Nanofiltration process
Numerical simulation on optimization for MGGH flue in thermal power plants

Related Author

LIU Wen-sheng
WANG Da-feng
ZHANG Yong-jun(Zhejiang Provincial Electric Power Testing and Research Institute
GAO Luan1
GAO Hai-dong21.Shenhua Shengli Energy Branch Company
ZHAO Zhidan1
SONG Taiji2
CHEN Zhigang1

Related Institution

Zhejiang Electric Power Test and Research Institute
Shenhua Shengli Energy Branch
Xi'an Thermal Power Research Institute Co., Ltd
Huaneng Rizhao Power Generation Co., Ltd
Xi'an Thermal Power Research Institute Co.,Ltd.
0