您当前的位置:
首页 >
文章列表页 >
CAUSE ANALYSIS OF DESUPERHEATER FRACTURE FOR BOILER OF 600 MW UNIT
Thermal Power Generation   Issue 5, Pages: 87-88(2007)
更新时间:2025-09-28
    • CAUSE ANALYSIS OF DESUPERHEATER FRACTURE FOR BOILER OF 600 MW UNIT

    • DOI:10.19666/j.rlfd.2007.05.026    

      CLC: TK223
    • Published:2007

    移动端阅览

  • LIU Feng, YAN Kai-ping, TONG Ya-feng, et al. CAUSE ANALYSIS OF DESUPERHEATER FRACTURE FOR BOILER OF 600 MW UNIT[J]. Thermal Power Generation, 2007, (5): 87-88. DOI: 10.19666/j.rlfd.2007.05.026.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

87

下载量

4

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

CAUSE ANALYSIS OF LOAD BEING LIMITED FOR ONE BOILER
Modification of secondary stage desuperheater for superheater in a 1025t/h boiler
CALCULATION OF WALL-TEMPERATURE FOR SUPERHEATER AND REHEATER OF HG670/13.7-YM13 TYPE BOILER
ANALYSIS AND TREATMENT OF SOMEWHAT LOWER MAIN STEAM TEMPERATURE PROBLEM FOR 2045 t/h BOILER
ESTABLISHMENT OF SERVICE LIFE MANAGEMENT SYSTEM FOR HIGH-TEMPERATURE BOILER TUBES IN THERMAL POWER PLANT BASED ON B/S STRUCTURE

Related Author

WANG Zhi-gang
ZHANG Guang-cai
WANG Chun-chang
WANG Xiao-xu
HAN YingXi’an Thermal Power Research Institute Co Ltd
HUANG Junjie
LIU Tong
XU Gang

Related Institution

Xi'an Thermal Power Research Institute Co., Ltd
Guangzhou Hengyun Thermal Power (D) Factory Co., Ltd
North China Electric Power University
North China Electric Power University Beijing
0