CAUSE ANALYSIS CONCERNING "TURNING-OVER" OF THE BED-MATERIAL IN 300 MW CFB BOILER AND COUNTERMEASURES IN ITS OPERATION
Thermal Power Generation   Issue 6, Pages: 127-129(2007)
更新时间:2025-09-28
    • CAUSE ANALYSIS CONCERNING "TURNING-OVER" OF THE BED-MATERIAL IN 300 MW CFB BOILER AND COUNTERMEASURES IN ITS OPERATION

    • DOI:10.19666/j.rlfd.2007.06.036    

      CLC: TK229.6
    • Published:2007

    移动端阅览

  • JIANG Mao-qing1, GAO Hong-pei2, KUANG Wei1, et al. CAUSE ANALYSIS CONCERNING "TURNING-OVER" OF THE BED-MATERIAL IN 300 MW CFB BOILER AND COUNTERMEASURES IN ITS OPERATION[J]. Thermal Power Generation, 2007, (6): 127-129. DOI: 10.19666/j.rlfd.2007.06.036.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

179

下载量

16

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

CLOSED-LOOP CONTROL SYSTEM OF CFB BOILERS
DETERMINATION OF FUEL LAYER THICKNESS IN CFB BOILERS
CHARACTERISTIC ANALYSIS OF TUBE-BURST OCCURRED ON HEATING SURFACE OF THE WATER-WALL IN 300 MW CFB BOILER
CAUSE ANALYSIS OF SLAGGING IN A 440 t/h CFB BOILER AND COUNTERMEASURES THEREOF
CAUSE AND COUNTERMEASURES FOR HIGHER AIR-LEAKAGE RATE OF THE ROTARY AIR PREHEATER USED FOR CFB BOILER OF 300 MW UNIT

Related Author

HUANG Weigang
CHEN Xiuping
ZHU Hongbo
SHI Shuaijun
WU YeDatang Honghe Power Generation Co Ltd
CHENG Zhong-hui
ZHENG Tian-yang
DONG Zhi-qian

Related Institution

Shaanxi Shenmu
Daliuta Thermal Power Plant Shaanxi Shenmu
Daliuta Thermal Power Plant
China Shenma Group Nylon Chemical Company, Zhoushan Electric Power Installation Company, Pingdingshan 467013,,, Zhejiang
Datang Honghe Power Generation Co., Ltd
0