您当前的位置:
首页 >
文章列表页 >
FEATURES AND OPERATION EXPERIENCE OF A 10000 t/h SEAWATER CIRCULATION COOLING SYSTEM
Thermal Power Generation   Issue 8, Pages: 88-90(2007)
更新时间:2025-09-28
    • FEATURES AND OPERATION EXPERIENCE OF A 10000 t/h SEAWATER CIRCULATION COOLING SYSTEM

    • DOI:10.19666/j.rlfd.2007.08.022    

      CLC: TM621
    • Published:2007

    移动端阅览

  • YANG Ming1, GUAN Xiu-yan2, LUO Jiang-he3, et al. FEATURES AND OPERATION EXPERIENCE OF A 10000 t/h SEAWATER CIRCULATION COOLING SYSTEM[J]. Thermal Power Generation, 2007, (8): 88-90. DOI: 10.19666/j.rlfd.2007.08.022.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

166

下载量

10

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

Performance test and application study for environmentally friendly marine organism inhibitor in coastal power plants
AN APPROACH TO TUBE MATERIAL SELECTION FOR COOLING TUBES IN CONDENSER USING MUNICIPAL RECLAIMED WATER
Limitations of seawater FGD process and its adaptability on sulfur content of coal

Related Author

CHEN Yuzhong
ZHANG Xiaogang
XU Miaofeng
CHEN Hao
LI Xinjun
TANG Sanyou
冯兴隆
LEI Ming

Related Institution

Huaneng Haimen Thermal Power Co.,Ltd.
Xi'an Thermal Power Research Institute Co.,Ltd.
Huadian Zouxian Power Plant
0