SOME PROBLEMS NEEDING TO PAY ATTETION IN WASTE WATER TREATMENT SYSTEM DESIGN FOR LIME-STONE/GYPSUM WET DESULFURATION
Thermal Power Generation   Issue 8, Pages: 103-104(2007)
更新时间:2025-09-28
    • SOME PROBLEMS NEEDING TO PAY ATTETION IN WASTE WATER TREATMENT SYSTEM DESIGN FOR LIME-STONE/GYPSUM WET DESULFURATION

    • DOI:10.19666/j.rlfd.2007.08.027    

      CLC: X703
    • Published:2007

    移动端阅览

  • XU Cheng-liang, LIAO Da-shenZhejiang Tiandi Environmental Protection Co Ltd. SOME PROBLEMS NEEDING TO PAY ATTETION IN WASTE WATER TREATMENT SYSTEM DESIGN FOR LIME-STONE/GYPSUM WET DESULFURATION[J]. Thermal Power Generation, 2007, (8): 103-104. DOI: 10.19666/j.rlfd.2007.08.027.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

354

下载量

12

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

RETROFIT OF 600 m3/h MECHANICALLY AGITATED SETTLING POND IN BAOJI POWER PLANT NO. 2
TEST STUDY ON THE CALCULATION METHOD OF ENRICHMENT FACTOR FOR CIRCULATORY COOLING WATER
APPLICATION OF EDI WATER TREATMENT TECHNOLOGY ONTO 4×600 MW UNITS IN SHANGDU POWER PLANT
DEVELOPMENT OF HOME-MADE POWDERED RESIN AND TEST IN APPLICATION THEREOF
Diameter design for main drainage pipe in high pressure steam air preheater of a waste incineration power plant

Related Author

赵承红
何广仁
鲁礼勋
张广孙
裴胜
许建学
ZHANG Guang-wen Beijing Guohua Electric Power Technique Research Center Co.
LI PeiHuaneng Shangdu Power Generation Co Ltd

Related Institution

Xi'an Thermal Power Research Institute Co., Ltd
Shanxi Electric Power Construction Fourth Engineering Company
Beijing Guohua Electric Power Technology Research Center Co., Ltd
Huaneng Shangdu Power Generation Co., Ltd
Baotou First Thermal Power Plant of Northern United Power Co., Ltd
0