您当前的位置:
首页 >
文章列表页 >
EMULATION MODELLING OF GAS TURBINE SYSTEM
Thermal Power Generation   Issue 11, Pages: 56-59(2007)
更新时间:2025-09-28
    • EMULATION MODELLING OF GAS TURBINE SYSTEM

    • DOI:10.19666/j.rlfd.2007.11.015    

      CLC: TP391.9
    • Published:2007

    移动端阅览

  • ZHENG Jian-tao1, CHEN Wen-yan2, LU Zhi-qing21.Xi’an Thermal Power Reseach Institute Co Ltd. EMULATION MODELLING OF GAS TURBINE SYSTEM[J]. Thermal Power Generation, 2007, (11): 56-59. DOI: 10.19666/j.rlfd.2007.11.015.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

383

下载量

5

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

APPLICATION OF A NEW TYPE DISTRIBUTED CONTROL SYSTEM IN COMBINED CYCLE POWER PLANTS
Research on comprehensive performance of combustion chamber of blast-furnace-gas-fired gas turbine
Integration and performance analysis of high back pressure gas turbine combined cycle power generation system
Heat transfer characteristics of pin fin arrays with different solidity degrees

Related Author

薛建中
马光宇
郑玮琳
代佳奇
宋雪松
薛鹏
高四艺
杨雨

Related Institution

Ansteel Group's New Steel Qidashan Iron Mine Thermal Power Plant
Guodian Thermal Power Research Institute
Xi’an Thermal Power Research Institute Co., Ltd.
School of Energy and Power Engineering, Northeast Dianli University
0