您当前的位置:
首页 >
文章列表页 >
ANALYSIS OF VIBRATION FOR IHI-VS24 MEDIUM SPEED COAL MILL AND RETROFIT THEREOF
Thermal Power Generation   Issue 12, Pages: 88-89(2007)
更新时间:2025-09-28
    • ANALYSIS OF VIBRATION FOR IHI-VS24 MEDIUM SPEED COAL MILL AND RETROFIT THEREOF

    • DOI:10.19666/j.rlfd.2007.12.025    

      CLC: TM621.2
    • Published:2007

    移动端阅览

  • WU Pu-gangDatang Hancheng Power Generation Co Ltd. ANALYSIS OF VIBRATION FOR IHI-VS24 MEDIUM SPEED COAL MILL AND RETROFIT THEREOF[J]. Thermal Power Generation, 2007, (12): 88-89. DOI: 10.19666/j.rlfd.2007.12.025.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

88

下载量

4

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

Type selection of coal pulverizing system for 660 MW coal-fired boiler burning semi-coke
Monitoring model for fired coal quality in utility boilers based on flue gas components
Auto combustion adjustment in boiler based on coal quality correction using air to coal radio
PROBLEMS EXISTING IN APPLICATION OF PLASMA OILLESS IGNITION TECHNOLOGY AND COUNTERMEASURES THEREOF
INFLUENCE OF PUTTING AUXILIARY AIR OF DOUBLE INLET AND DOUBLE OUTLET COAL PULVERIZER INTO OPERATION UPON ECONOMIC BEHAVIOR OF THE BOILER

Related Author

LIU Jiali
YAO Wei
WANG Guifang
YANG Zhongcan
WANG Zhichao
FANG Shunli
LI Huijun
WANG Xiaofeng

Related Institution

Xi'an Thermal Power Research Institute Co.,Ltd.
School of Energy and Power Engineering,North China Electric Power University
State Grid Electric Power Research Institute Hebei Electric Power Company
Harbin Huitong Electrical Power Engineering Co.,Ltd.
Heilongjiang Electric Power Exploration and Design Institute Co.,Ltd.
0