您当前的位置:
首页 >
文章列表页 >
NON-DESTUCTIVE INSPECTION OF AUTOMATIC WELDING DEFECTS FOR BOILER PIPES WITH SMALL DIAMETER AND LARGE WALL-THICKNESS IN ULTRA-SUPERCRITICAL UNITS
Thermal Power Generation   Issue 2, Pages: 81-83(2008)
更新时间:2025-09-28
    • NON-DESTUCTIVE INSPECTION OF AUTOMATIC WELDING DEFECTS FOR BOILER PIPES WITH SMALL DIAMETER AND LARGE WALL-THICKNESS IN ULTRA-SUPERCRITICAL UNITS

    • DOI:10.19666/j.rlfd.2008.02.021    

      CLC: TG441.7
    • Published:2008

    移动端阅览

  • SHAO Tian-you1, CAI Hui2, HOU Zhao-tang21.Huaneng Yuhuan Power Plant. NON-DESTUCTIVE INSPECTION OF AUTOMATIC WELDING DEFECTS FOR BOILER PIPES WITH SMALL DIAMETER AND LARGE WALL-THICKNESS IN ULTRA-SUPERCRITICAL UNITS[J]. Thermal Power Generation, 2008, (2): 81-83. DOI: 10.19666/j.rlfd.2008.02.021.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

137

下载量

5

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

CAUSE ANALYSIS OF HIGH TEMPERATURE CORROSION OCCURRED ON THE WATER-WALL AND RESOLUTION MEASURES THEREOF
CAUSE ANALYSIS OF SLAGGING IN BABCOCK 2209 t/h BOILERS MADE IN GERMANY AND PREVENTION THEREOF
ESTABLISHMENT OF SERVICE LIFE MANAGEMENT SYSTEM FOR HIGH-TEMPERATURE BOILER TUBES IN THERMAL POWER PLANT BASED ON B/S STRUCTURE
ANTI-WEAR TECHNOLOGY FOR CFB BOILERS
CAUSE ANALYSIS OF HIGH-TEMPERATURE CORROSION ON WATER-WALL OF A 440 t/h BOILER

Related Author

ZHANG Guo-bing
LIANG Gui-long
LI Hu
DU Bao-hua
LI Yao-jun
LIU Zhen-yu
LI Chung-min
WANG Zhong-jie

Related Institution

Hejin Power Plant
Huaneng Dezhou Power Plant
Henan Zhongfu Electric Power Co., Ltd
Henan Thermal Power Construction First Company
Heze Power Plant
0