您当前的位置:
首页 >
文章列表页 >
DESIGN FEATURES AND OPERATION PERFORMANCE OF THE FIRST ORIMULSION OIL BOILER FOR 600 MW UNIT
Thermal Power Generation   Issue 3, Pages: 39-42(2008)
更新时间:2025-09-28
    • DESIGN FEATURES AND OPERATION PERFORMANCE OF THE FIRST ORIMULSION OIL BOILER FOR 600 MW UNIT

    • DOI:10.19666/j.rlfd.2008.03.010    

      CLC: TM621.2
    • Published:2008

    移动端阅览

  • SUI Zhi-gang1, WU Lü-bin1, CHEN Can2 1.Zhanjiang Electric Power Co Ltd. DESIGN FEATURES AND OPERATION PERFORMANCE OF THE FIRST ORIMULSION OIL BOILER FOR 600 MW UNIT[J]. Thermal Power Generation, 2008, (3): 39-42. DOI: 10.19666/j.rlfd.2008.03.010.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

57

下载量

0

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

STUDY ON BOILER’S OPERATION PERFORMANCE AND OPTIMIZATION OF OXYGEN CONTENT IN FLUE GAS
PROBLEMS EXISTING IN APPLICATION OF PLASMA OILLESS IGNITION TECHNOLOGY AND COUNTERMEASURES THEREOF
ANALYSIS OF VIBRATION FOR IHI-VS24 MEDIUM SPEED COAL MILL AND RETROFIT THEREOF
IMPROVEMENT OF RB CONTROL FOR DIRECT FIRING BOILER EQUIPED WITH BLOWER COAL PULVERIZED
CAUSES LEADING TO OVER-TEMPERATURE OF SUPERHEATER FOR BOILERS OF SUPERCRITICAL 600MW UNITS AT INITIAL STAGE OF START-UP AND CONTROL THEREOF

Related Author

CAI Jie-jin
MA Xiao-qian
LIAO Yan-fen
YIN Li-bao
CUI Zhen-dong
YU Yue-xi
WEN Zhi-yong
WANG Li(Guangdong Provincial Electric Power Testing & Research Institute

Related Institution

South China University of Technology
Guangdong Electric Power Test and Research Institute
Datang Hancheng Second Power Generation Co., Ltd
Xi'an Thermal Power Research Institute Co., Ltd
Datang Xinyang Huayu Power Generation Co., Ltd
0