您当前的位置:
首页 >
文章列表页 >
CAUSE ANALYSIS OF REAR PLATEN SUPERHEATER LEAKAGE FOR BOILER OF ULTRA-SUPERCRITICAL UNIT AND REMEDIAL MEASURES THEREOF
Thermal Power Generation   Issue 3, Pages: 43-44(2008)
更新时间:2025-09-28
    • CAUSE ANALYSIS OF REAR PLATEN SUPERHEATER LEAKAGE FOR BOILER OF ULTRA-SUPERCRITICAL UNIT AND REMEDIAL MEASURES THEREOF

    • DOI:10.19666/j.rlfd.2008.03.011    

      CLC: TM621.2
    • Published:2008

    移动端阅览

  • ZHANG Lei1. CAUSE ANALYSIS OF REAR PLATEN SUPERHEATER LEAKAGE FOR BOILER OF ULTRA-SUPERCRITICAL UNIT AND REMEDIAL MEASURES THEREOF[J]. Thermal Power Generation, 2008, (3): 43-44. DOI: 10.19666/j.rlfd.2008.03.011.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

106

下载量

2

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

RETROFITTING OF AUXILIARY VALVE FOR SOLENOID BLOWOUT VALVES
ANALYSIS OF SUPERHEATER'S TUBE-BURST CAUSED BY FALLING-AWAY OF OXIDE SKIN
CAUSE ANALYSIS OF LEAKAGE ACCIDENTS FOR “FOUR KINDS OF TUBES” AND COUNTERMEASURES THEREOF
CAUSE ANALYSIS OF SOMEWHAT LOW RATE FOR PUTTING HIGH-PRESSURE HEATER OF 200 MW UNITS INTO SERVICE AND RETROFITTING MEASURES THEREOF
CAUSE ANALYSIS OF HIGH-PRESSURE HEATER LEAKAGE FOR 300MW UNIT AND COUNTERMEASURES THEREOF

Related Author

LUO Sheng
LI Yao-jun
LI Peihua
HE Dongrong
CAO Zhi-yang(Huaneng Pinliang Power Generation Co Ltd
LI Yan-dong
LI Zhi-xu
LIU Wei-bingYuelong Power Generation Co Ltd

Related Institution

The Pearl River Power Plant Guangdong
Xi'an Thermal Power Research Institute Co.,Ltd.
Huaibei Power Plant Anhui Huaibei
Shaoguan Power Plant
Huaneng Pingliang Power Generation Co., Ltd
0