RETROFIT OF AIR CAP FOR A 130t/h CFB BOILER
Thermal Power Generation   Issue 6, Pages: 45-46(2008)
更新时间:2025-09-28
    • RETROFIT OF AIR CAP FOR A 130t/h CFB BOILER

    • DOI:10.19666/j.rlfd.2008.06.012    

      CLC: TK229.66
    • Published:2008

    移动端阅览

  • XIAO Xing-guoShijiazhuang Chengfeng Thermal Power Co Ltd. RETROFIT OF AIR CAP FOR A 130t/h CFB BOILER[J]. Thermal Power Generation, 2008, (6): 45-46. DOI: 10.19666/j.rlfd.2008.06.012.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

117

下载量

2

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

CLOSED-LOOP CONTROL SYSTEM OF CFB BOILERS
DETERMINATION OF FUEL LAYER THICKNESS IN CFB BOILERS
ANALYSIS AND REMEDY OF BURST-LEAKAGE OF "FOUR KINDS OF TUBE" IN BOILERS OF SHIMEN POWER PLANT
CAUSE ANALYSIS CONCERNING "TURNING-OVER" OF THE BED-MATERIAL IN 300 MW CFB BOILER AND COUNTERMEASURES IN ITS OPERATION
CAUSE ANALYSIS OF ECONOMIZER WORN-OUT FOR A 670 t/h BOILER IN ONE POWER PLANT AND RETROFITTING DESIGN THEREOF

Related Author

CHEN Xiuping
HUANG Weigang
SHI Shuaijun
ZHU Hongbo
GUO Qing-feng
JIANG Mao-qing1
GAO Hong-pei2
KUANG Wei1

Related Institution

Shaanxi Shenmu
Daliuta Thermal Power Plant Shaanxi Shenmu
Daliuta Thermal Power Plant
China Shenma Group Nylon Chemical Company, Zhoushan Electric Power Installation Company, Pingdingshan 467013,,, Zhejiang
Shimen Power Plant
0