您当前的位置:
首页 >
文章列表页 >
PREVENTIVE MEASURES FOR RE-BURNING IN TAIL END FLUE DUCT OF CFB BOILERS
Thermal Power Generation   Issue 7, Pages: 26-29(2008)
更新时间:2025-09-28
    • PREVENTIVE MEASURES FOR RE-BURNING IN TAIL END FLUE DUCT OF CFB BOILERS

    • DOI:10.19666/j.rlfd.2008.07.006    

      CLC: TK229.66
    • Published:2008

    移动端阅览

  • YAN Zheng1, XU Hua-nian2, TIAN De-jun3, et al. PREVENTIVE MEASURES FOR RE-BURNING IN TAIL END FLUE DUCT OF CFB BOILERS[J]. Thermal Power Generation, 2008, (7): 26-29. DOI: 10.19666/j.rlfd.2008.07.006.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

92

下载量

1

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

CLOSED-LOOP CONTROL SYSTEM OF CFB BOILERS
DETERMINATION OF FUEL LAYER THICKNESS IN CFB BOILERS
CAUSE ANALYSIS CONCERNING "TURNING-OVER" OF THE BED-MATERIAL IN 300 MW CFB BOILER AND COUNTERMEASURES IN ITS OPERATION
CHARACTERISTIC ANALYSIS OF TUBE-BURST OCCURRED ON HEATING SURFACE OF THE WATER-WALL IN 300 MW CFB BOILER
CAUSE ANALYSIS OF SLAGGING IN A 440 t/h CFB BOILER AND COUNTERMEASURES THEREOF

Related Author

HUANG Weigang
CHEN Xiuping
ZHU Hongbo
SHI Shuaijun
LI Bing31.Sichuan Baima CFB Exemlary Power Plant Co Ltd
TANG Jun1
KUANG Wei1
GAO Hong-pei2

Related Institution

Shaanxi Shenmu
Daliuta Thermal Power Plant Shaanxi Shenmu
Daliuta Thermal Power Plant
China Shenma Group Nylon Chemical Company, Zhoushan Electric Power Installation Company, Pingdingshan 467013,,, Zhejiang
Chongqing Electric Power College
0