您当前的位置:
首页 >
文章列表页 >
ANALYSIS OF FEASIBILITY FOR RETROFITTING INDUCED DRAFT FAN INTO A LOW SPEED ONE
Thermal Power Generation   Issue 10, Pages: 46-48(2008)
更新时间:2025-09-28
    • ANALYSIS OF FEASIBILITY FOR RETROFITTING INDUCED DRAFT FAN INTO A LOW SPEED ONE

    • DOI:10.19666/j.rlfd.2008.10.013    

      CLC: TK223.26
    • Published:2008

    移动端阅览

  • YANG Xue-wei, YU Zhong, WANG Fang Weihai Botong Thermal Power Co Ltd. ANALYSIS OF FEASIBILITY FOR RETROFITTING INDUCED DRAFT FAN INTO A LOW SPEED ONE[J]. Thermal Power Generation, 2008, (10): 46-48. DOI: 10.19666/j.rlfd.2008.10.013.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

74

下载量

1

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

CLOSED-LOOP CONTROL SYSTEM OF CFB BOILERS
WET FLUE GAS DESULFURATION TECHNOLOGY WITHOUT BOOSTER FAN FOR 135MW UNIT
ENERGY-SAVING RETROFIT OF INDUCED DRAFT FANS IN GUODIAN SHIZUISHAN POWER-GENERATION CO LTD, NING XIA HUI AUTONOMOUS REGION
DETERMINATION OF FUEL LAYER THICKNESS IN CFB BOILERS
CAUSE ANALYSIS ABOUT SOMEWHAT LARGER ELECTRIC CURRET OF INDUCED DRAFT FAN FOR ONE BOILER

Related Author

CHEN Xiuping
HUANG Weigang
ZHUANG Hufeng
YANG Chen
WANG Zhi-cheng
ZHANG Xin-pin
DONG Kang-tian
SHI Shuaijun

Related Institution

Shaanxi Shenmu
Daliuta Thermal Power Plant Shaanxi Shenmu
Daliuta Thermal Power Plant
Qianqing Power Generation Co., Ltd.
0