PROBLEMS OCCURRED FROM ADDITIONALLY INSTALLING HIGH-VOLTAGE FREQUENCY CONVERTER ONTO CONDENSATE PUMPS AND SOLVING MEASURES THEREOF
Thermal Power Generation   Vol. 37, Issue 12, Pages: 96-98(2008)
更新时间:2025-09-28
    • PROBLEMS OCCURRED FROM ADDITIONALLY INSTALLING HIGH-VOLTAGE FREQUENCY CONVERTER ONTO CONDENSATE PUMPS AND SOLVING MEASURES THEREOF

    • DOI:10.19666/j.rlfd.2008.12.025    

      CLC: TM621.7
    • Published:2008

    移动端阅览

  • LI Jun1, LI Jian-he1, HUANG Li-li21.Huaibei Guo'an Electric Power Co Ltd. PROBLEMS OCCURRED FROM ADDITIONALLY INSTALLING HIGH-VOLTAGE FREQUENCY CONVERTER ONTO CONDENSATE PUMPS AND SOLVING MEASURES THEREOF[J]. Thermal Power Generation, 2008, 37(12): 96-98. DOI: 10.19666/j.rlfd.2008.12.025.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

119

下载量

7

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

REALIZATION OF ZERO SPECIFIC CONSUMPTION FOR CONDENSATE PUMPS,CIRCULATING-WATER PUMPS,AND MOTOR-DRIVEN FEED-WATER PUMPS DURING START-UP PROCESS OF 300MW UNITS
FREQUENCY CONVERSION RETROFIT AND ENERGY-SAVING OF CONDENSATE PUMP IN HUAYU POWER PLANT
PRACTICE OF CHANGING FEED-WATER TREATMENT MODE FOR 300 MW UNIT IN HEZE POWER PLANT FROM AVT(R) INTO AVT(O)
CAUSES LEADING TO ABNORMALITY IN MEASUREMENT USING DRUM-LEVEL GAUGE IN ZHUNGE’R POWER PLANT
ANALYSIS OF TURBINE-BOILER COORDINATED CONTROL AND AGC SYSTEM IN YANGLUO POWER PLANT

Related Author

ZHOU DaGuang'an Power Generation Co Ltd
XIONG Kang-jun Datang Huayu Power Generation Co Ltd
LI Xiu-juan Heze Power Plant
CHANG Shi-ji
WANG Zhen
LI De-shi
CHEN Min
HE Tong-xiang

Related Institution

Guang'an Power Generation Co., Ltd
Datang Huayu Power Generation Co., Ltd
Heze Power Plant
Zhungeer Power Plant Hohhot
Wuhan University