您当前的位置:
首页 >
文章列表页 >
CAUSE ANALYSIS OF SCREWED HANGER ROD BREAKAGE ON CONSTANT FORCE HANGING BRACKET FOR MAIN STEAM PIPELINE OF 300 MW UNIT IN ONE POWER PLANT
Thermal Power Generation   Vol. 37, Issue 12, Pages: 99-102(2008)
更新时间:2025-09-28
    • CAUSE ANALYSIS OF SCREWED HANGER ROD BREAKAGE ON CONSTANT FORCE HANGING BRACKET FOR MAIN STEAM PIPELINE OF 300 MW UNIT IN ONE POWER PLANT

    • DOI:10.19666/j.rlfd.2008.12.026    

      CLC: TM621
    • Published:2008

    移动端阅览

  • KANG Yu-jun, WANG Jun-min, WANG Bi-ning, et al. CAUSE ANALYSIS OF SCREWED HANGER ROD BREAKAGE ON CONSTANT FORCE HANGING BRACKET FOR MAIN STEAM PIPELINE OF 300 MW UNIT IN ONE POWER PLANT[J]. Thermal Power Generation, 2008, 37(12): 99-102. DOI: 10.19666/j.rlfd.2008.12.026.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

86

下载量

0

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

DEVELOPMENT AND APPLICATION OF REMOTE MONITORING SYSTEM FOR CHEMICALS DOSING IN WATER TREATMENT OF POWER PLANTS
RETROFITTING OF AUXILIARY VALVE FOR SOLENOID BLOWOUT VALVES
CAUSE ANALYSIS OF OUTLET FLEXIBLE CONNECTOR’S BREAKAGE FOR 9E TYPE GENERATOR
OPTIMIZATION OF DEB COORDINATED CONTROL SYSTEM FOR 300 MW UNIT
COMPREHENSIVE CONTROL OF DUST POLLUTION IN COAL HANDLING SILO BAY OF POWER PLANT

Related Author

YANG Wansheng
XU Ting
LUO Sheng
GAN Meng-bi
CHENG Fang-lin
CHEN Peng
LI Ya-jun
ZHANG Hua-lei

Related Institution

Wuhan University
The Pearl River Power Plant Guangdong
Moon Bay Gas Turbine Power Plant
Huadian Xinjiang Branch
0