您当前的位置:
首页 >
文章列表页 >
OPTIMAL LOAD DISTRIBUTION AMONG UNITS IN THERMAL POWER PLANT
Thermal Power Generation   Vol. 38, Issue 1, Pages: 1-3(2009)
更新时间:2025-09-28
    • OPTIMAL LOAD DISTRIBUTION AMONG UNITS IN THERMAL POWER PLANT

    • DOI:10.19666/j.rlfd.2009.01.001    

      CLC: TM761.22
    • Published:2009

    移动端阅览

  • ZHANG Qiu-sheng1, FU Ren-jie21.Beijing Guohua Electric Power Technology Research Centre Co Ltd. OPTIMAL LOAD DISTRIBUTION AMONG UNITS IN THERMAL POWER PLANT[J]. Thermal Power Generation, 2009, 38(1): 1-3. DOI: 10.19666/j.rlfd.2009.01.001.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

320

下载量

12

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

PRACTICE OF CHANGING FEED-WATER TREATMENT MODE FOR 300 MW UNIT IN HEZE POWER PLANT FROM AVT(R) INTO AVT(O)
CAUSES LEADING TO ABNORMALITY IN MEASUREMENT USING DRUM-LEVEL GAUGE IN ZHUNGE’R POWER PLANT
ANALYSIS OF TURBINE-BOILER COORDINATED CONTROL AND AGC SYSTEM IN YANGLUO POWER PLANT
CAUSE ANALYSIS OF CORROSION FOR CHEMICAL-DOSING TUBE ENTERING INTO THE DRUM PORT
EXPLOSION PREVENTING RETROFIT AND OPERATION MEASURES FOR COAL PULVERIZING SYSTEM IN DAGANG POWER PLANT

Related Author

LI Xiu-juan Heze Power Plant
CHANG Shi-ji
WANG Zhen
LI De-shi
CHEN Min
ZHANG Cuihong
LIU Qiang
CHEN Hao

Related Institution

Heze Power Plant
Zhungeer Power Plant Hohhot
Huaneng Yangluo Power Plant
Wuhan University
0