您当前的位置:
首页 >
文章列表页 >
TEST STUDY ON OPTIMIZATION OF OPERATION FOR 300MW STEAM TURBINE
Thermal Power Generation   Vol. 38, Issue 1, Pages: 72-76(2009)
更新时间:2025-09-28
    • TEST STUDY ON OPTIMIZATION OF OPERATION FOR 300MW STEAM TURBINE

    • DOI:10.19666/j.rlfd.2009.01.020    

      CLC: TK267
    • Published:2009

    移动端阅览

  • ZHANG Yu1, LIU Wei-ping1, CHEN Yu-pu2, et al. TEST STUDY ON OPTIMIZATION OF OPERATION FOR 300MW STEAM TURBINE[J]. Thermal Power Generation, 2009, 38(1): 72-76. DOI: 10.19666/j.rlfd.2009.01.020.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

126

下载量

9

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

Operation performance of PEM electrolyzer in dual-mode operation for hydrogen production and hot standby with integrated ammonia synthesis waste heat storage and utilization
Research progress of thermal energy storage technology in solar thermal power generation and combined heat and power generation
Analysis on mechanism and economic benefit of a new type of steam pulsed acoustic dust cleaning device
Economy analysis for an ultra supercritical 1 000 MW unit with EC-BEST thermal dynamic system

Related Author

裴长运
孙名家
王桂楠
殷诗奇
王露
宋玮
彭莘
于吉庆

Related Institution

WANG Lin
西安远能新能源科技有限公司
华能苏州热电有限责任公司
哈尔滨汽轮机厂有限责任公司
西安热工研究院有限公司
0