ANALYSIS ABOUT FCB FUNCTION OF 350MW UNIT MANUFACTURED BY MITSUBISHI CORPORATION
Thermal Power Generation   Vol. 38, Issue 1, Pages: 83-86(2009)
更新时间:2025-09-28
    • ANALYSIS ABOUT FCB FUNCTION OF 350MW UNIT MANUFACTURED BY MITSUBISHI CORPORATION

    • DOI:10.19666/j.rlfd.2009.01.023    

      CLC: TM621
    • Published:2009

    移动端阅览

  • LI Jun-minDepartment of Hai'yang Nuclear Power Project under Zhongdiantou Electric Power Engineering Co Ltd. ANALYSIS ABOUT FCB FUNCTION OF 350MW UNIT MANUFACTURED BY MITSUBISHI CORPORATION[J]. Thermal Power Generation, 2009, 38(1): 83-86. DOI: 10.19666/j.rlfd.2009.01.023.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

134

下载量

4

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

EXPERIENCE DEALING WITH THE FAST CUT BACK OF 600MW SUPECRITICAL UNITS
DESIGN AND APPLICATION OF FIELD BUS IN AUXILIARY CONTROL SYSTEM OF THERMAL POWER UNITS
OPTIMIZATION OF CONTROL STRATEGY IN PRIMARY FREQUENCY MODULATION
PRACTICE OF CHANGING FEED-WATER TREATMENT MODE FOR 300 MW UNIT IN HEZE POWER PLANT FROM AVT(R) INTO AVT(O)
CAUSES LEADING TO ABNORMALITY IN MEASUREMENT USING DRUM-LEVEL GAUGE IN ZHUNGE’R POWER PLANT

Related Author

CHEN Hao
Xue Xian-min1
ZENG Wei-dong2
WU Zhong-sheng1
JIN Jian31.Guangdong Heyuan Power Plant
HUANG Su
ZHENG Hang-lin Fujian Provincial Electric Power Testing and Research Institute
LI Xiu-juan Heze Power Plant

Related Institution

Huaneng Shanghai Shidongkou Second Power Plant
Guangdong Heyuan Power Plant
Xi'an Thermal Power Research Institute Co., Ltd
Huaneng Chaohu Power Plant
Fujian Electric Power Test and Research Institute
0