STUDY ON MODEL PREDICTIVE CONTROL OF SUPERHEATED STEAM TEMPERATURE FOR 300 MW COAL-FIRED UNIT
Thermal Power Generation   Vol. 38, Issue 3, Pages: 52-55(2009)
更新时间:2025-09-28
    • STUDY ON MODEL PREDICTIVE CONTROL OF SUPERHEATED STEAM TEMPERATURE FOR 300 MW COAL-FIRED UNIT

    • DOI:10.19666/j.rlfd.2009.03.012    

      CLC: TM621.3
    • Published:2009

    移动端阅览

  • LUI Lin-hui, HUANG Yong-hong, ZHANG Ya-qiangCollege of Energy and Power Engineering. STUDY ON MODEL PREDICTIVE CONTROL OF SUPERHEATED STEAM TEMPERATURE FOR 300 MW COAL-FIRED UNIT[J]. Thermal Power Generation, 2009, 38(3): 52-55. DOI: 10.19666/j.rlfd.2009.03.012.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

329

下载量

11

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

IMPROVEMENT OF RB CONTROL STRATEGY FOR 300 MW THERMAL POWER UNITS AND IMPLEMENTATION THEREOF
OPTIMAL FEEDBACK CONTROL STRATEGY FOR MAIN STEAM TEMPERATURE
APPLICATION OF INDUSTRIAL ETHER NETWORK TECHNOLOGY IN DCS SYSTEM OF ZHUJIANG POWER PLANT
CAUSES RESULTING IN EFFICIENCY-REDUCING OF ELECTROSTATIC PRECIPITATOR FOR 300 MW UNIT AND COUNTER MEASURES THEREOF
APPLICATION OF NON-LINEAR PID CONTROLLER IN THE MAIN STEAM TEMPERATURE CONTROL

Related Author

GAO Luan1
GAO Hai-dong21.Shenhua Shengli Energy Branch Company
李阳春
邹建明
杨启文
ZHENG Jianping
CHEN Zuo-wen Huaneng Shantou Power Plant
GU Jun-jie

Related Institution

Shenhua Shengli Energy Branch
Xi'an Thermal Power Research Institute Co., Ltd
Zhejiang Thermal Power Construction Company
Hohai University Changzhou Campus
0