您当前的位置:
首页 >
文章列表页 >
AN APPROACH TO SAFETY INSPECTION BEFORE ISTALLATION OF BOILERS IN THERMAL POWER PLANTS
Thermal Power Generation   Vol. 38, Issue 3, Pages: 91-93(2009)
更新时间:2025-09-28
    • AN APPROACH TO SAFETY INSPECTION BEFORE ISTALLATION OF BOILERS IN THERMAL POWER PLANTS

    • DOI:10.19666/j.rlfd.2009.03.023    

      CLC: TM621.2
    • Published:2009

    移动端阅览

  • ZHANG Dong-wen1, KE Hao1, LI Zhong-wei1, et al. AN APPROACH TO SAFETY INSPECTION BEFORE ISTALLATION OF BOILERS IN THERMAL POWER PLANTS[J]. Thermal Power Generation, 2009, 38(3): 91-93. DOI: 10.19666/j.rlfd.2009.03.023.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

54

下载量

2

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

Finite element analysis of transient stress in boiler drum during hot start-up process
OPERATION PERFORMANCE ANALYSIS AND MEASURES TAKEN FOR IMPROVING SOOT BLOWERS ON BOILERS NO.5 AND 6 AT JINGYUAN POWER PLANT
PREDICTIVE CONTROL OF WATERLEVEL IN THE BOILER DRUM
ON-LINE MONITORING AND MANAGEMENT OF SERVICE LIFE FOR BOILER DRUMS BASED ON DCS AND MIS
CONTROL OF DRUM-WALL TEMPERATURE DIFFERENCE ON LARGE-CAPACITY BOILERS

Related Author

LI Yong
XU Kaicheng
WANG Gang
赵长祥
徐治皋
刘彤
徐钢
庞力平

Related Institution

School of Energy and Power Engineering, Northeast Dianli University
Jingyuan First Power Generation Co., Ltd.
Southeast University
North China Electric Power University
0