Application of turbine HP-LP bypass system combining with heating in supercritical 350 MW unit
Thermal Power Generation   Vol. 47, Issue 5, Pages: 101-105(2018)
更新时间:2025-09-28
    • Application of turbine HP-LP bypass system combining with heating in supercritical 350 MW unit

    • DOI:10.19666/j.rlfd.201801029    

      CLC: TK262
    • Published Online:03 May 2018,

      Published:2018

    移动端阅览

  • XUE Zhaonan, YANG Rongzu, WANG Ting, et al. Application of turbine HP-LP bypass system combining with heating in supercritical 350 MW unit[J]. Thermal Power Generation, 2018, 47(5): 101-105. DOI: 10.19666/j.rlfd.201801029.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

392

下载量

22

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

AN APPROACH TO FEASIBILITY AND ECONOMIC BEHAVIOR OF ADOPTING DIRECT DRY TYPE COOLING SYSTEM FOR SUPERCRITICAL UNITS
TRIAL OPERATION OF BOILER STARTINGUP FOR 600 MW SUPERCRITICAL UNIT IN QINBEI POWER PLANT
SEVERAL PROBLEMS NEEDING TO PAY ATTENTION FOR CHEMICAL SUPERVISION IN CAPITAL CONSTRUCTION COMMISSIONING OF SUPERCRITICAL 600MW UNIT
CONTROL OPTIMIZATION OF MAIN AUTOMATIC REGULATING SYSTEMS FOR HOME-MADE SUPERCRITICAL 600 MW UNIT
APPLICATION OF PLANT-LEVEL SUPERVISORY INFORMATION SYSTEM FOR SUPERCRITICAL UNIT IN YAOMENG POWER PLANT

Related Author

ZHU Jun
GUAN Xiu-yan
QIN Chao-hui1
LI Xue-Zhong21.Nantong Power Plant under Huaneng International Electric Power Co Ltd
DAI Chuan-long
DIAO Bao-shengGuodian Changzhou Power Generation Co Ltd
ZHU Xiao-xing
XUN Xin

Related Institution

Northwest Electric Power Design Institute
Huaneng Nantong Power Plant
Huaneng Qinbei Power Plant
Guodian Changzhou Power Generation Co., Ltd
Hunan Electric Power Test and Research Institute
0