您当前的位置:
首页 >
文章列表页 >
Optimization scheme of reduced pressure steam blowing for double reheat unit
Thermal Power Generation   Vol. 48, Issue 8, Pages: 131-134(2019)
更新时间:2025-09-28
    • Optimization scheme of reduced pressure steam blowing for double reheat unit

    • DOI:10.19666/j.rlfd.201812220    

      CLC: TK229.2
    • Published Online:01 August 2019,

      Published:2019

    移动端阅览

  • BU Junfeng, QI Dali. Optimization scheme of reduced pressure steam blowing for double reheat unit[J]. Thermal Power Generation, 2019, 48(8): 131-134. DOI: 10.19666/j.rlfd.201812220.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

69

下载量

2

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

CORROSION CHARACTERS OF TP347H STEEL UNDER ATMOSPHERE OF SUPERHEATERS OF BIOMASSBURNED BOILERS(Ⅱ)
CORROSIVE CHARACTORS OF TP347H STEEL IN SUPERHEATER'S ATMOSPHERE OF BIOMASS-BURNED BOILER
TEST AND THERMAL PERFORMANCE ANALYSIS OF SUPERHEATER AND REHEATER FOR UTILITY BOILERS
CALCULATION OF WALL-TEMPERATURE FOR SUPERHEATER AND REHEATER OF HG670/13.7-YM13 TYPE BOILER
ANALYSIS AND TREATMENT OF SOMEWHAT LOWER MAIN STEAM TEMPERATURE PROBLEM FOR 2045 t/h BOILER

Related Author

YIN Jia-min1
WU Zhan-song21.Guangdong Electric Power Design Institute
YIN Jia-min
WU Zhan-songKey Laboratory of Thermal Science and Power Engineering under Educatoinal Ministry
YANG Tao
WANG Zhen-wen
LIU Qi
LIU Tong

Related Institution

Key Laboratory of Thermal Science and Power Engineering, Ministry of Education, Tsinghua University
Guangdong Electric Power Design and Research Institute
Guodian Thermal Power Research Institute
North China Electric Power University Beijing
0