您当前的位置:
首页 >
文章列表页 >
Feasibility of hot gas path components upgrading for a PG9351FA gas turbine
Thermal Power Generation   Vol. 48, Issue 6, Pages: 138-142(2019)
更新时间:2025-09-28
    • Feasibility of hot gas path components upgrading for a PG9351FA gas turbine

    • DOI:10.19666/j.rlfd.201901006    

      CLC: TK472
    • Published Online:10 June 2019,

      Published:2019

    移动端阅览

  • LI Yunfeng, JIANG Hongwei, LU Xiaoyu, et al. Feasibility of hot gas path components upgrading for a PG9351FA gas turbine[J]. Thermal Power Generation, 2019, 48(6): 138-142. DOI: 10.19666/j.rlfd.201901006.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

130

下载量

3

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

CAUSE AND ANALYSIS OF WATER-LEVEL FLUCTUATION IN IP DRUM WHEN THE GAS TURBINE RUNS IN OFF-DESIGN CONDITION
Performance research of partially recuperative gas turbine combined cycle under off-design conditions
Energy saving optimization of condensate pump under deep peak load regulation
Economic research for gas-supercritical carbon dioxide combined cycle
Thermal performance analysis of high-parameter gas turbine and supercritical carbon dioxide combined cycle system

Related Author

SUN Cheng-zhi
SUN Yu
LI Zi-chong Shenzhen City Guangqian Electric Power Co Ltd
LIU Taohong
LIU Hengping
SONG Xiaowei
YANG Yongping
DENG Jia

Related Institution

Guangqian Electric Power Co., Ltd
College of Energy, Power and Mechanical Engineering, North China Electric Power University
Tianjin Huaneng Yangliuqing Thermal Power Co., Ltd
School of Energy and Mechanical Engineering, Shanghai Electric Power University
Shanghai Power Generation Equipment Complete Design and Research Institute Co., Ltd
0