Experimental investigation on deep peak load regulation of coal-fired boiler based on on-line measurement of flame temperature field
Thermal Power Generation   Vol. 48, Issue 8, Pages: 49-54(2019)
更新时间:2025-09-28
    • Experimental investigation on deep peak load regulation of coal-fired boiler based on on-line measurement of flame temperature field

    • DOI:10.19666/j.rlfd.201902023    

      CLC: TK16;TK311
    • Published Online:01 August 2019,

      Published:2019

    移动端阅览

  • LIU Hui, ZHOU Ke, XIE Bing, et al. Experimental investigation on deep peak load regulation of coal-fired boiler based on on-line measurement of flame temperature field[J]. Thermal Power Generation, 2019, 48(8): 49-54. DOI: 10.19666/j.rlfd.201902023.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

238

下载量

8

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

Study on the thermodynamic characteristics of generalized regenerative system used for deep peak load regulating operation
Thermal control system retrofit for deep peak load regulation of thermal power unit
CAUSE ANALYSIS OF HIGH-TEMPERATURE CORROSION ON WATER-WALL OF A 440 t/h BOILER
CAUSE ANALYSIS AND PREVENTION OF BURST-LEAKAGE FROM "FOUR TUBE KINDS" IN A HOME-MADE 670 t/h BOILER
COMBUSTION ADJUSTMENT TEST FOR SUPERCRITICAL BOILER OF 600MW UNIT

Related Author

XIE Tian
LYU Kai
HUANG Jiasi
LUO Qing
GAO Lin
WANG Lin
LIU Chang
JI Jiangming

Related Institution

Xi'an Xire Energy saving Technology Co., Ltd
Huaneng Shaanxi Qinling Power Generation Co., Ltd
North United Power Co., Ltd. Linhe Thermal Power Plant
Heze Power Plant
Datang Luoyang Shouyangshan Power Plant
0