您当前的位置:
首页 >
文章列表页 >
Simulation and performance analysis of cogeneration system for 600~699MW level centralized high back pressure air cooling units
Thermal Power Generation   Vol. 48, Issue 10, Pages: 51-56(2019)
更新时间:2025-09-28
    • Simulation and performance analysis of cogeneration system for 600~699MW level centralized high back pressure air cooling units

    • DOI:10.19666/j.rlfd.201902033    

      CLC: TK115;TK123
    • Published Online:29 September 2019,

      Published:2019

    移动端阅览

  • GU Yujiong, LIU Haochen, GENG Zhi. Simulation and performance analysis of cogeneration system for 600~699MW level centralized high back pressure air cooling units[J]. Thermal Power Generation, 2019, 48(10): 51-56. DOI: 10.19666/j.rlfd.201902033.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

223

下载量

1

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

A deep waste heat utilization system for utility boilers based on segmented air preheater design
Design optimization for distributed combined heat and power cogeneration systems:research progress
Optimization on flue gas waste heat recovery scheme in utility boiler
Heating temperature characteristics and exergy analysis for high back pressure heating unit
Technical and economic analysis of combined heat, electricity and hydrogen supply system by solar driven solid oxide cell system

Related Author

YANG Yongping
XU Gang
CHEN Yuan
HAN Yu
LI Yongyi
WU Qiong
REN Hongbo
WANG Wei

Related Institution

Beijing Key Laboratory of Pollutant Control in Thermal Power Production Process, North China Electric Power University
School of Energy and Mechanical Engineering, Shanghai Electric Power University
Shenhua Guohua (Beijing) Electric Power Research Institute Co., Ltd
School of Energy and Power Engineering, Xi'an Jiaotong University
State Grid Comprehensive Energy Service Group Co., Ltd
0