您当前的位置:
首页 >
文章列表页 >
Lay-up corrosion control technology for secondary circuit thermodynamic equipment of high temperature gas-cooled reactor
Thermal Power Generation   Vol. 48, Issue 12, Pages: 8-12(2019)
更新时间:2025-09-28
    • Lay-up corrosion control technology for secondary circuit thermodynamic equipment of high temperature gas-cooled reactor

    • DOI:10.19666/j.rlfd.201902043    

      CLC: TM623.7
    • Published Online:31 December 2019,

      Published:2019

    移动端阅览

  • YAO Hongmeng, YAO Jiantao, SUN Yaping, et al. Lay-up corrosion control technology for secondary circuit thermodynamic equipment of high temperature gas-cooled reactor[J]. Thermal Power Generation, 2019, 48(12): 8-12. DOI: 10.19666/j.rlfd.201902043.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

151

下载量

1

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

PROBLEMS EXISTING IN OPERATION OF WET LIMESTONE/GYPSUM DESULFURATION SYSTEM IN LUOHUANG POWER PLANT AND ANALYSIS THEREOF
CAUSE ANALYSIS OF CORROSION FOR CHEMICAL-DOSING TUBE ENTERING INTO THE DRUM PORT
CAUSE ANALYSIS AND PROTECTIVE MEASURES FOR CORROSIVE PERFORATION OF CONDENSER’S COPPER TUBES IN YUNFU POWER PLANT
CAUSE ANALYSIS OF FREQUENT BURST-LEAKAGE OCCURRED ON REHEATER AND WATER-WALL OF 300 MW UTILITY BOILER
CAUSE ANALYSIS ABOUT LEAKAGE OF "FOUR TUBE KINDS" IN BOILERS

Related Author

CHEN Shao min
ZHANG Cuihong
LI Lin
WANG Jiu-zhen
YIN Gang (Xi’an Jiaotong University
AN Lian-suo1
TONG Peng1
JIANG Gen-shan1

Related Institution

Chongqing Electric Power College Chongqing
Shengli Power Plant Dongying
Yunfu Power Plant Guangdong Yunfu
Yunfu Power Plant
0