您当前的位置:
首页 >
文章列表页 >
Morphology and removal of 110mAg in PWR nuclear power station
Thermal Power Generation   Vol. 49, Issue 6, Pages: 122-127(2020)
更新时间:2025-09-28
    • Morphology and removal of 110mAg in PWR nuclear power station

    • DOI:10.19666/j.rlfd.201909172    

      CLC: TK112
    • Published Online:24 May 2020,

      Published:2020

    移动端阅览

  • LIN Genxian, SUN Yun, LIU Canshuai, et al. Morphology and removal of 110mAg in PWR nuclear power station[J]. Thermal Power Generation, 2020, 49(6): 122-127. DOI: 10.19666/j.rlfd.201909172.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

84

下载量

0

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

TRANSIENT ANALYSIS ABOUT SWITH OVER OF MOTOR-DRIVEN FEED-WATER PUMP ON CONVENTIONAL ISLAND IN NUCLEAR POWER PLANT
STUDY ON SELECTING CONDENSATE POLISHING SYSTEM FOR PRESSURIZED WATER REACTOR NUCLEAR POWER PLANTS
A SAMMRY OF GLASS-SOLIDIFICATION TECHNOLOGY FOR RADIOACTIVE SOLID WASTAGES
Function analysis for automatic depressurization system in AP1000 nuclear power plant
Cleaning schemes for the secondary circuit in high temperature gas-cooled reactors

Related Author

WU Huanyun Zhongguang Nuclear Power Engineering Co Ltd
YANG Hongbo
JIA Chongyang41.Shandong Electric Power Engineering Consulting Institute Co Ltd
MA Yaohua3
PAN Zhenbo2
WANG Ailing1
CHEN Mingzhou
ZHANG Ruifeng

Related Institution

CGN Engineering Co., Ltd
Datang Baqiao Thermal Power Plant
Guodian Construction Inner Mongolia Energy Co., Ltd
Sanmenxia Huayang Power Generation Co., Ltd
Shandong Electric Power Engineering Consulting Institute Co., Ltd
0