您当前的位置:
首页 >
文章列表页 >
Feasibility analysis for ultra-high parameter CFB boiler with secondary reheat
Thermal Power Generation   Vol. 49, Issue 6, Pages: 32-37(2020)
更新时间:2025-09-28
    • Feasibility analysis for ultra-high parameter CFB boiler with secondary reheat

    • DOI:10.19666/j.rlfd.202001034    

      CLC: TK229.6
    • Published Online:24 May 2020,

      Published:2020

    移动端阅览

  • GAO Qin, KONG Hao, YANG Hairui, et al. Feasibility analysis for ultra-high parameter CFB boiler with secondary reheat[J]. Thermal Power Generation, 2020, 49(6): 32-37. DOI: 10.19666/j.rlfd.202001034.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

214

下载量

1

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

Measurment and empirical correlation of heat transfer coefficient in external heat exchanger of a CFB boiler
Low-NOx combustion retrofitting and optimal adjustment tests for a 130t/h CFB boiler
THE INFLUENCE OF STEAM FLOW FIELD AT CONDENSER'S TUBEBUNDLE INLET UPON EXHAUST PRESSURE OF STEAM TURBINE
DESIGN AND ECONOMIC OPERATION OF DOUBLE-SPEED CIRCULATORY WATER PUMP FOR 135 MW INDIRECT AIR-COOLED UNIT
DESIGN OF CONTROL SYSTEM FOR HOMEMADE 410 t/h CFB BOILERS

Related Author

SUN Xianbin
SHI Zhenghai
JIN Senwang
LIU Haifeng
ZHAO Pengbo
LI Li
CHEN Jianjun
ZHOU Junhu

Related Institution

China Huaneng Group Clean Energy Technology Research Institute Co., Ltd
State Key Laboratory of Clean Energy Utilization, Zhejiang University
Zhejiang Baineng Technology Co., Ltd
Huazhong Power Grid Co., Ltd
Datang Changshan Thermal Power Plant
0