您当前的位置:
首页 >
文章列表页 >
Design and condensation performance analysis on the first stage of main compressor in MW-level supercritical carbon dioxide power generation system
Thermal Power Generation   Vol. 49, Issue 10, Pages: 180-188(2020)
更新时间:2025-09-28
    • Design and condensation performance analysis on the first stage of main compressor in MW-level supercritical carbon dioxide power generation system

    • DOI:10.19666/j.rlfd.202004099    

      CLC: TK474.8
    • Published Online:15 September 2020,

      Published:2020

    移动端阅览

  • XU Jun, CHAO Xujia, FAN Shiwang, et al. Design and condensation performance analysis on the first stage of main compressor in MW-level supercritical carbon dioxide power generation system[J]. Thermal Power Generation, 2020, 49(10): 180-188. DOI: 10.19666/j.rlfd.202004099.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

498

下载量

3

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

Research on performance prediction model of supercritical carbon dioxide centrifugal compressor
Dynamic model of supercritical carbon dioxide compression testing system
Review on research of supercritical carbon dioxide radial-inflow turbine
Study on peak regulation capacity of a coal-fired supercritical carbon dioxide cogeneration unit
Optimization of hot primary air duct for pulverizing system and its engineering application

Related Author

TENG Geng
SHEN Xin
OUYANG Hua
ZHU Yubo
FAN Wei
LIU Zhigang
YANG Jiandao
CHEN Laijie

Related Institution

Gas Turbine and Civil Aviation Engine Engineering Research Center of the Ministry of Education
Shanghai Turbine Factory
College of Energy, Power and Mechanical Engineering, North China Electric Power University
Xi'an Thermal Power Research Institute Co., Ltd
School of Hydraulic and Civil Engineering, Shandong Agricultural University
0