您当前的位置:
首页 >
文章列表页 >
Comprehensive control technique of ABS blockage of air preheater in a 600 MW unit
Thermal Power Generation   Vol. 50, Issue 2, Pages: 132-137(2021)
更新时间:2025-09-28
    • Comprehensive control technique of ABS blockage of air preheater in a 600 MW unit

    • DOI:10.19666/j.rlfd.202005130    

      CLC: TM621
    • Published:2021

    移动端阅览

  • WANG Xing, LIU Guozuo, ZHANG Zhiqiang, et al. Comprehensive control technique of ABS blockage of air preheater in a 600 MW unit[J]. Thermal Power Generation, 2021, 50(2): 132-137. DOI: 10.19666/j.rlfd.202005130.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

302

下载量

1

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

Variation characteristics of coal ash in an ultra supercritical 1000MW unit equipped with SCR denitration device
Experimental study on improving the adaptability of SCR flue gas denitrification equipment for opposite wall fired furnace
ANALYSIS OF PLATE-TURNOVER PHENOMENON CONCERNING RUDUCTION GEARBOX OF 29-VI(T) 1780 TYPE AIR PREHEATER SURPASSING THE CLUTCH COUPLING AND TECHNICAL RETROFITTING OF THE STARTING-UP CIRCUIT
INFLUENCE OF SCR DENITRIFICATION FACILITY UPON THE BOILER STRUCTURE
STUDY ON BEHAVIOR OF CATALYCTS FOR SCR DENITRIFICATION USING DIFFERENT TiO2 AS CARRIER

Related Author

LIU Yanfeng
HUO Yuheng
GAO Jianqiang
ZHANG Xurui
XIE Xinhua
HE Jinliang
ZHAO Ningbo
SONG Yubao

Related Institution

College of Energy, Power and Mechanical Engineering, North China Electric Power University
Suzhou Xire Energy saving and Environmental Protection Technology Co., Ltd
Xi'an Thermal Power Research Institute Co., Ltd
Huangpu District Gas Management Office, Guangzhou City
Guangdong Yuedian Jinghai Power Generation Co., Ltd
0