您当前的位置:
首页 >
文章列表页 >
Scheduling scheme of heliostat field of tower solar power station based on NSGA-Ⅱ
Thermal Power Generation   Vol. 50, Issue 5, Pages: 94-101(2021)
更新时间:2025-09-28
    • Scheduling scheme of heliostat field of tower solar power station based on NSGA-Ⅱ

    • DOI:10.19666/j.rlfd.202006207    

      CLC: TP18;TM615
    • Published:2021

    移动端阅览

  • GAO Weidong, LYU Lixia, WANG Ziqi, et al. Scheduling scheme of heliostat field of tower solar power station based on NSGA-Ⅱ[J]. Thermal Power Generation, 2021, 50(5): 94-101. DOI: 10.19666/j.rlfd.202006207.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

338

下载量

3

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

Scheduling optimization model for multi-source district heating system
STUDY ON MULTI-OBJECTIVE OPTIMIZATION FOR CONTROL SYSTEM OF THE THERMAL PROCESS AND ITS APPLICATION IN BOILER-TURBINE COORDINATED CONTROL
Configuration effect of energy storage system in Mengdong grid for new energy consumption
Multi-objective optimization method of energy hub operation considering integrated demand response
Multi-objective optimal dispatching of industrial park integrated energy systems based on NSGA-Ⅲ

Related Author

YANG Xianliang
ZHANG Hao
YANG Lindi
SHI Guohua
ZHANG Tie-junSouth-east China University
L Jian-hong
GUO Ying
YIN Hongxue

Related Institution

College of Energy, Power and Mechanical Engineering, North China Electric Power University
Southeast University
Beijing Variable Frequency Technology Engineering Technology Research Center (North China University of Technology)
State Grid Inner Mongolia Eastern Electric Power Co., Ltd. Electric Power Science Research Institute
Guangzhou Power Supply Bureau of Guangdong Power Grid Co., Ltd
0