您当前的位置:
首页 >
文章列表页 >
Equipment optimization for burning Shenhua coal in a 330MW coal-fired unit
Thermal Power Generation   Vol. 50, Issue 3, Pages: 176-181(2021)
更新时间:2025-09-28
    • Equipment optimization for burning Shenhua coal in a 330MW coal-fired unit

    • DOI:10.19666/j.rlfd.202007067    

      CLC: TK16
    • Published Online:22 February 2021,

      Published:2021

    移动端阅览

  • GAO Yongkun, LI Xingzhi, DING Hongsheng, et al. Equipment optimization for burning Shenhua coal in a 330MW coal-fired unit[J]. Thermal Power Generation, 2021, 50(3): 176-181. DOI: 10.19666/j.rlfd.202007067.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

118

下载量

1

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

SLAGGING PREVENTION TECHNOLOGY FOR BURNING SHENHUA COAL IN TANGENTIAL FIRING BOILERS
CAUSES LEADING TO SLAGGING IN FURNACE OF TANGENTIAL FIRING PULVERIZED COAL BOILER AND PREVENTIVE MEASURES THEREOF
STUDY ON SCHEME OF PREVENTING A 200T/H COALFIRING BOILER FROM SLAGGING PROBLEMS
CAUSE ANALYSIS OF SLAGGING IN BOILERS BURNING SHENFU DONGSHENG COAL AND PREVENTIVE MEASURES THEREOF
TEST STUDY ON POLLUTION BEHAVIOR OF HEATING SURFACE IN BOILERS BURNING SHENHUA COAL

Related Author

WANG Pingang1
SONG Chang2
WANG Yueming31.Shenhua Group Corporation
HU Min
RAO Supo
HU Dianru
ZHANG Bo
WEN Jun

Related Institution

Shenhua Group Co., Ltd
Shenhua Guohua Electric Power Branch
Shajiao C Power Plant
Guangdong Yuedian Group Co., Ltd.
0