您当前的位置:
首页 >
文章列表页 >
Reason analysis and prevention for flame extinction in an instant at full load in a certain ultra supercritical 1 000 MW boiler
Thermal Power Generation   Vol. 50, Issue 9, Pages: 173-178(2021)
更新时间:2025-09-28
    • Reason analysis and prevention for flame extinction in an instant at full load in a certain ultra supercritical 1 000 MW boiler

    • DOI:10.19666/j.rlfd.202101027    

      CLC: TM621.2
    • Published:2021

    移动端阅览

  • WU Shougui, LI Qiang, GUO Xuemin. Reason analysis and prevention for flame extinction in an instant at full load in a certain ultra supercritical 1 000 MW boiler[J]. Thermal Power Generation, 2021, 50(9): 173-178. DOI: 10.19666/j.rlfd.202101027.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

188

下载量

1

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

Dynamic simulation model for ultra supercritical 1 000MW unit boilers
ADAPTABILITY OF 3 000 t/h ULTRA SUPERCRITICAL BOILER FOR MIX BURNING WITH LOW HEAT VALUE COAL
MODIFICATION OF AUTOMATIC CONTROL SYSTEM FOR FEEDWATER OXYGENATION IN ONCE-THROUGH BOILER
CONTROL STRATEGY OF PRIMARY FREQUENCY REGULATION AND ITS OPTIMIZATION FOR 2×600 MW ULTRA SUPERCRITICAL UNITS IN HEYUAN POWER PLANT
MODELING OF SPRAY DESUPERHEATER IN AN ULTRA SUPERCRITICAL ONCE-THROUGH BOILER

Related Author

XU Hui 1
XU Ershu2 1.College of Control and Computer
LU Huaidian
ZENG Biqun
CHEN Weiwu
YANG Bo Huaneng Haimen Power Plant
MA Zhiguo
NIE Xin Shenhua Hebei Cangdong Power Generation Co.

Related Institution

School of Control and Computer Engineering, North China Electric Power University
Key Laboratory of Power Station Equipment Status Monitoring and Control, Ministry of Education, North China Electric Power University
Huaneng Haimen Power Plant
Shenhua Hebei Guohua Cangdong Power Generation Co., Ltd
Northwest Electric Power Design Institute
0