您当前的位置:
首页 >
文章列表页 >
Feasibility study on cluster construction of CCUS projects in areas lacking geological storage conditions: a case study of Jiangxi Province
Thermal Power Generation   Vol. 50, Issue 12, Pages: 132-138(2021)
更新时间:2025-09-28
    • Feasibility study on cluster construction of CCUS projects in areas lacking geological storage conditions: a case study of Jiangxi Province

    • DOI:10.19666/j.rlfd.202104053    

      CLC: X701
    • Published:2021

    移动端阅览

  • LIU Muxin, XIAO Mingyue, LIANG Xi, et al. Feasibility study on cluster construction of CCUS projects in areas lacking geological storage conditions: a case study of Jiangxi Province[J]. Thermal Power Generation, 2021, 50(12): 132-138. DOI: 10.19666/j.rlfd.202104053.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

978

下载量

2

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

Preliminary discussion on development of carbon capture, utilization and storage for carbon neutralization
Technical economic analysis of carbon capture units after combustion
Comparison of levelized cost of electricity between coal-fired power plants with carbon capture, utilization and storage and renewable energy storage technologies
The upgradation of coal-fired power generation industry supports China's energy conservation, emission reduction and carbon neutrality
Dynamic simulation of wind-solar-storage energy system under variable operating conditions

Related Author

ZHANG Lu
ZHANG Jiutian
HE Qing
WANG Lijian
ZHANG Xian
JIA Li
YANG Yang
FAN Jingli

Related Institution

Beijing Normal University China Green Development Collaborative Innovation Center
College of Energy, Power and Mechanical Engineering, North China Electric Power University
China 21st Century Agenda Management Center
Sustainable Development and Energy Policy Research Center, School of Energy and Mining, China University of Mining and Technology
China Huaneng Group Co., Ltd
0