为实现2060“碳中和”目标,在传统火电机组(CFPP)基础上,开发利用太阳能和储能,提出了带储热的槽式太阳能光热系统、压缩空气储能(CAES)和火电机组集成的“光火储”一体化发电系统。此系统既可克服火电机组和压缩空气储能的耦合(CFPP+CAES)系统在释能阶段从火电机组抽取热量的缺点,又能充分利用太阳能资源,提高可再生能源的利用率、降低火电机组发电煤耗。利用EBSILON软件对该系统在火电机组100%负荷工况下的热经济性、节煤效果进行了分析,结果表明:与传统CFPP系统相比,该“光火储”系统中方案2平均热耗率降低了33.5 k J/(kW·h),平均标准煤耗率降低了1.30 g/(kW·h);“光火储”一体化发电系统中方案2的CAES系统?效率可以达到68.81%,较先进绝热压缩空气储能(AA-CAES)系统提升了16.49%,且通过计算每个部件?损失,发现CAES系统5—8号换热器节能潜力较大;根据2019年实行的某市峰谷分时电价标准,该“光火储”一体化发电系统每年净售电收益最大为1 045.49万元。
Abstract
An integrated power generation system combined with a parabolic trough solar system
a compressed air energy storage(CAES) system
and a thermal power plant is proposed to achieve the goal of “carbon neutralization”in 2060
and utilize solar energy and energy storage technology based on coal-fired power plant(CFPP). This system can overcome the disadvantage of extracting heat from the thermal power plant during the discharge process of CAES when coupling with CFPP and makes full use of the heat produced by the parabolic trough solar system to improve the utilization of renewable energy and reduce the coal consumption. The thermal performance and coalsaving effect of this system under 100% load operation condition of the thermal power plant are analyzed by EBSILON software. The results show that compared with the conventional CFPP system
the average heat consumption of the integrated system with scheme 2 reduces by 33.5 k J/(kW·h)
and the average standard coal consumption rate decreases by 1.30 g/(kW·h). The CAES system of the integrated power generation system with scheme 2 can achieve 68.81% productivity
16.49% higher than that of the advanced adiabatic compressed air energy storage(AA-CAES) system. The calculating results of the exergy loss of each component reveal that the No.5~8heat exchanger in the CAES system has a higher energy-saving potential. The annual electricity sales profit of the integrated power generation system is up to 10.454 9 million yuan according to the peak and off-peak electricity usage times and rates of a city implemented in 2019.