Combustion optimization adjustment test of 350 MW unit boiler for high temperature corrosion prevention
Thermal Power Generation   Vol. 51, Issue 2, Pages: 164-170(2022)
更新时间:2025-05-30
    • Combustion optimization adjustment test of 350 MW unit boiler for high temperature corrosion prevention

    • DOI:10.19666/j.rlfd.202108167    

      CLC: TM621.2
    • Published:2022

    移动端阅览

  • WANG He, ZHAO Bin, ZHANG Zihan, et al. Combustion optimization adjustment test of 350 MW unit boiler for high temperature corrosion prevention[J]. Thermal Power Generation, 2022, 51(2): 164-170. DOI: 10.19666/j.rlfd.202108167.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

174

下载量

1

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

CAUSE ANALYSIS OF HIGH TEMPERATURE CORROSION OCCURRED ON THE WATER-WALL AND RESOLUTION MEASURES THEREOF
CAUSE ANALYSIS OF HIGH-TEMPERATURE CORROSION ON WATER-WALL OF A 440 t/h BOILER
CAUSE ANALYSIS AND PREVENTION OF BURST-LEAKAGE FROM "FOUR TUBE KINDS" IN A HOME-MADE 670 t/h BOILER
COMPARISON OF PRESSURE-STABILIZING METHOD AND PRESSURE-REDUCING METHOD FOR STEAM BLOWING BOILER OF SUPERCRITICAL UNITS
THE EFFECTS OF SEPARATING OVER-FIRED AIR SYSTEM FOR BOILERS EQUIPED IN GUOHUA TAI CANG POWER PLANT

Related Author

ZHANG Guo-bing
SONG Shao-wei1
QIU Xian-tang1
ZHOU Hai-qing1
LIU Xiao-hong2
WANG Guang-bing1 (1.Heze Power Plant
ZONG Zhi-wei(Datang Luoyang Shouyangshan Power Plant
WANG Hong-yu1

Related Institution

Hejin Power Plant
Heze Power Plant
Xi'an Thermal Power Research Institute Co., Ltd
Datang Luoyang Shouyangshan Power Plant
Huaneng Taicang Power Generation Co., Ltd
0