[1]刘众元,高义斌,刘志兵,等.基于能量平衡的亚临界循环流化床锅炉压火时长计算方法[J],2025,54(11):161-168.
[1]刘众元,高义斌,刘志兵,等.基于能量平衡的亚临界循环流化床锅炉压火时长计算方法[J],2025,54(11):161-168. DOI: 10.19666/j.rlfd.202502056.
DOI:10.19666/j.rlfd.202502056.
压火时长作为压火调峰的核心控制参数,直接影响机组运行的安全性和经济性。然而,由于压火过程中各热力学参数的复杂耦合与动态特性,现有计算方法难以实现高效、精准计算。针对亚临界CFB锅炉压火调峰,提出一种基于能量平衡的压火时长计算方法,建立压火期间锅炉蓄热量、汽轮机利用热量与散热量的动态平衡模型,推导出床料、浇注料、金属受热面、工质及碳燃烧等关键热源的蓄放热公式,最终计算得到压火时长。以某300 MW亚临界CFB机组为例,计算值与实测值绝对误差控制在5 min内,相对误差小于10%,能够满足压火调峰工程需要。研究结果表明:蓄热方面,金属受热面蓄热对压火时长的贡献度为35%~41%、床料与浇注料的贡献度各约20%、床料中碳燃烧的贡献度为10%~15%,气体和工质蓄热的贡献度不足2%,可忽略;耗热方面,发电耗热占比最高,且随电负荷增大而增大,汽轮机克服本身转动阻力所需的热占比约20%,机组散热占比低于5%。通过提高压火初始温度、增加床料量、燃用高挥发分煤种、降低机组压火期间电负荷可显著延长压火时长。通常只有将压火期间平均电负荷降低至1%额定负荷以下,压火时长才能够大于2 h。
As a core control parameter in peak regulation via banking fire
the banking fire duration directly affects the safety and economic efficiency of unit operation. However
due to the complex coupling and dynamic characteristics of thermodynamic parameters during the banking process
it is difficult for existing calculation methods to achieve efficient and accurate calculations. An energy-balance-based method was proposed for banking fire duration calculation in subcritical CFB boilers. A dynamic equilibrium model was established for heat storage and turbine heat utilization and heat dissipation during banking fire
deriving heat storage and release formulas for key heat sources
such as bed material
refractory
metal heating surfaces
working fluid
and carbon combustion. Finally
the banking fire duration was obtained. Taking a 300 MW sub-critical CFB unit as an example
the absolute error between the calculated value and the measured value is controlled within 5 minutes
and the relative error is less than 10%
which can meet the engineering requirements of fire-hold peak-shaving. The results demonstrate that
in terms of heat storage
the heat storage of metal heating surfaces contributes 35%~41% to the banking fire duration. The contributions of bed material and refractory are each approximately 20%
and the contribution of carbon combustion in the bed material is 10%~15%. The contributions of gas and working fluid heat storage are less than 2% and can be neglected. In terms of heat consumption
heat consumption for power generation accounts for the highest proportion
and it increases with the electrical load. The heat required for the steam turbine to overcome its own rotational resistance accounts for approximately 20%
and the proportion of heat dissipation of the unit is less than 5%. By raising the initial temperature of banking fire
increasing the amount of bed material
using coal with high volatile content
and reducing the electrical load of the unit during banking
the banking fire duration can be significantly prolonged. Notably
the banking fire duration exceeds 2 hours only when the average electrical load during banking is reduced to 1% of rated load.
YAO X,YI B,YU Y,et al.Economic analysis of grid integration of variable solar and wind power with conventional power system[J].Applied Energy,2020,264:114706.
QI Y,HU W,DONG Y,et al.Optimal configuration of concentrating solar power in multienergy power systems with an improved variational autoencoder[J].Applied Energy,2020,274:115124.
XIN S W,WANG H,LI J B,et al.Discussion on the feasibility of deep peak regulation for ultrasupercritical circulating fluidized bed boiler[J].Energies,2022,15(20):7720.
舒印彪,张丽英,张运洲,等.我国电力碳达峰、碳中和路径研究[J].中国工程科学,2021,23(6):9-22.SHU Yinbiao,ZHANG Liying,ZHANG Yunzhou,et al.Carbon peak and carbon neutrality path for China’s power industry[J].Strategic Study of CAE,2021,23(6):9-22.
LIU Z Y,MA S X,PAN X F,et al.Experimental study on the load response rate under the dynamic combined combustion of PC coal and CFB coal in a CFB boiler[J].Fuel,2019,236:445-451.
于浩洋,高明明,张缦,等.循环流化床机组深度调峰性能分析与评价[J].热力发电,2020,49(5):65-72.YU Haoyang,GAO Mingming,ZHANG Man,et al.Performance analysis and evaluation of deep peakregulating for circulating fluidized bed units[J].Thermal Power Generation,2020,49(5):65-72.
HONG F,WANG R,SONG J,et al.A performance evaluation framework for deep peak shaving of the CFBboiler unit based on the DBN-LSSVM algorithm[J].Energy,2021,238:121659.
吕俊复,蒋苓,柯希玮,等.碳中和背景下循环流化床燃烧技术在中国的发展前景[J].煤炭科学技术,2023,51(1):514-522.LYU Junfu,JIANG Ling,KE Xiwei,et al.Future of circulating fluidized bed combustion technology in China for carbon neutralization[J].Coal Science and Technology,2023,51(1):514-522.
刘众元,武晓俊.循环流化床锅炉压火启动调峰技术综述[J].热能动力工程,2024,39(3):1-8.LIU Zhongyuan,WU Xiaojun.Review of banked fire and start-up peak regulation technology of circulating fluidized bed boilers[J].Journal of Engineering for Thermal Energy and Power,2024,39(3):1-8.
吕俊复,王君峰,姜孝国,等.超超临界循环流化床锅炉技术研发进展[J].中国电机工程学报,2024,44(17):6883-6899.LYU Junfu,WANG Junfeng,JIANG Xiaoguo,et al.Research and development of ultra-supercritical circulating fluidized bed boiler[J].Proceedings of the CSEE,2024,44(17):6883-6899.
佟博恒,李玉,马乐乐,等.350 MW超临界循环流化床机组压火调峰试验研究[J].热力发电,2025,54(7):82-90.TONG Boheng,LI Yu,MA Lele,et al.Experimental study on banked fire for peak regulation of supercritical circulating fluidized bed units[J].Thermal Power Generation,2025,54(7):82-90.
宋海峰,王君峰,安仲红,等.350 MW超临界循环流化床煤电机组启停调峰试验[J].热力发电,2025,54(7):63-70.SONG Haifeng,WANG Junfeng,AN Zhonghong,et al.Experimental study on start-stop peak regulation of a350 MW supercritical circulating fluidized bed coal-fired power unit[J].Thermal Power Generation,2025,54(7):63-70.
乔磊磊,王孝全,聂浩,等.循环流化床锅炉全负荷调峰特性研究[J].中国电机工程学报,2025,45(1):184-193.QIAO Leilei,WANG Xiaoquan,NIE Hao,et al.Research on peak shaving characteristics of circulating fluidized bed boilers at full load[J].Proceedings of the CSEE,2025,45(1):184-193.
申欣,赵强,乔晓磊,等.超临界CFB锅炉压火特性现场试验与数值模拟[J].煤炭学报,2022,47(7):2797-2807.SHEN Xin,ZHAO Qiang,QIAO Xiaolei,et al.Field test and numerical simulation of banked fire characteristics of supercritical CFB boiler[J].Journal of China Coal society,2022,47(7):2797-2807.
YAO Y G,JIANG L,DENG B Y,et al.Heat transfer analysis of stationary bed materials in a CFB boiler after a sudden power failure[J].Fuel Processing Technology,2021,211:106587.
0
Views
0
下载量
0
CSCD
Publicity Resources
Related Articles
Related Author
Related Institution
京公网安备11010802024621