赵斌, 孔垂茂, 肖卓楠, 等. 亚临界煤电机组增容提效技术及性能考核试验[J]. 热力发电, 2022,51(2):21-26.
ZHAO Bin, KONG Chuimao, XIAO Zhuonan, et al. The technology for capacity and efficiency increase and performance acceptance test of the subcritical coal-fired power unit[J]. Thermal Power Generation, 2022, 51(2): 21-26.
赵斌, 孔垂茂, 肖卓楠, 等. 亚临界煤电机组增容提效技术及性能考核试验[J]. 热力发电, 2022,51(2):21-26. DOI: 10.19666/j.rlfd.202110215.
ZHAO Bin, KONG Chuimao, XIAO Zhuonan, et al. The technology for capacity and efficiency increase and performance acceptance test of the subcritical coal-fired power unit[J]. Thermal Power Generation, 2022, 51(2): 21-26. DOI: 10.19666/j.rlfd.202110215.
为助力国家“双碳”目标的如期实现,对煤电机组进行升级改造已成为国家在能源电力领域的重要举措。以某电厂一台亚临界600 MW煤电机组为例,针对增容提效改造目标,采用先进的AIBT通流改造技术和辅机节能技术对机组实施改造,并对增容提效改造后的煤电机组进行性能考核试验,对比分析改造前后机组的热经济指标。结果表明:机组容量从600MW增容至630MW,额定负荷下热耗率降至7726.03k J/(kW·h),比改造前降低了500.17 kJ/(kW·h),低于改造目标值;供电标准煤耗降至289.68 g/(kW·h),较改造前降低了7.5%。该亚临界600 MW机组的增容提效改造案例可为煤电机组的安全节能升级改造提供借鉴和参考。
To help achieve the national carbon emission peak and carbon neutrality goal on schedule
upgrading coal-fired units has become an important measure in the field of energy and power in China. A subcritical 600 MW coal-fired power unit in a power plant is taken as the example
aiming at the goal of reform for capacity and efficiency increase
the advanced AIBT flow path retrofit technology and auxiliary energy-saving technology were used to carry out retrofit for the unit. The performance acceptance test of the coal-fired power unit after capacity and efficiency increasing retrofit was carried out
and the thermal economic indicators of the unit before and after retrofit were comparatively analyzed. The results show that
the unit capacity increased from 600 MW to 630 MW
the heat consumption rate of the unit at rated load decreased to 7 726.03 kJ/(kW·h)
which was 500.17 kJ/(kW·h)lower than that before the retrofitting
and was lower than the retrofit target value. The standard coal consumption for power supply was 289.68 g/(kW·h)
which was 7.5% lower than that before the reconstruction. The retrofit case of capacity and efficiency increasing of the subcritical 600 MW unit can provide references for safe energy-saving and upgrading of coal-fired power units.