登录
English 
学术文献
当期目录
过刊浏览
优先出版作者中心
投稿指南
出版道德声明无数据

登录
English 
学术文献
当期目录
过刊浏览
优先出版作者中心
投稿指南
出版道德声明无数据

1. 国能国华(北京)燃气热电有限公司
2. 河北省低碳高效发电技术重点实验室(华北电力大学)
3. 华北电力大学动力工程系
4. 华北电力大学能源动力与机械工程学院
纸质出版:2025
移动端阅览
王亚平, 王雨田, 李永毅, 等. 基于MOPSO算法的风光氢燃气轮机互补系统优化研究[J]. 热力发电, 2025,54(1):35-45.
WANG Yaping, WANG Yutian, LI Yongyi, et al. Optimization of wind-solar-hydrogen gas turbine complementary system configuration based on MOPSO algorithm[J]. Thermal Power Generation, 2025, 54(1): 35-45.
王亚平, 王雨田, 李永毅, 等. 基于MOPSO算法的风光氢燃气轮机互补系统优化研究[J]. 热力发电, 2025,54(1):35-45. DOI: 10.19666/j.rlfd.202406123.
WANG Yaping, WANG Yutian, LI Yongyi, et al. Optimization of wind-solar-hydrogen gas turbine complementary system configuration based on MOPSO algorithm[J]. Thermal Power Generation, 2025, 54(1): 35-45. DOI: 10.19666/j.rlfd.202406123.
为满足高比例可再生能源对电网调节能力提升的迫切需求,解决荷源不平衡问题,针对风光氢燃气轮机互补系统的优化配置方法进行了研究。构建了考虑启停和掺氢燃烧的燃气轮机联合循环机组数据驱动模型和光伏、风机与电解槽理论模型,提出了互补系统能量分配策略,基于多目标粒子群优化(multi-objective particle swarm optimization
MOPSO)算法建立了系统容量配置优化模型。以平准化度电成本A、荷源偏差和年碳排放量为优化目标,对互补系统进行了容量配置优化。结果表明,在选取气象数据和负荷数据下,系统配备风机85.28 MW、光伏108.69 MW、电解槽78.02 MW、储氢罐139 302 m~3时,全年运行最高可实现碳减排6%,荷源偏差仅0.02%,验证了由电解槽-燃气轮组成的系统架构能够有效解决电网荷源偏差问题。
To meet the urgent need for enhanced grid regulation capabilities due to the high penetration of renewable energy and to resolve load-source imbalances
the optimization configuration method for a wind-solar-hydrogen gas turbine complementary system is investigated. The data-driven model for a gas turbine combined cycle unit that considering start-stop dynamics and hydrogen-blending combustion is developed
along with theoretical models for photovoltaic arrays
wind turbines
and electrolyzers. An energy distribution strategy for the system is proposed
and the system capacity configuration optimization model based on MOPSO algorithm is established. With the objectives of minimizing the levelized cost of electricity
load-source deviation and annual carbon emissions
the capacity configuration of the complementary system is optimized. The results demonstrate that
using selected meteorological and load data
the system equipped with 85.28 MW wind turbines
108.69 MW photovoltaic arrays
78.02 MW electrolyzers
and a 139 302 m3 hydrogen storage tank can achieve up to a 6%reduction in annual carbon emissions and a load-source deviation of only 0.02%. This validates that the system architecture integrating electrolyzer-gas turbine can effectively mitigate load-source deviation issues in power grid.